Warning: satire
Institute for Applied Project Failure File no. IAP-2026-001 · Sheet 1 of 12

We will ruin your project. If you let us.

Ruining a project is not a craft. It is routine. Most organisations manage it without any outside help.

Seriously To the point

Behind the file number sits a concrete offer: Andreas Hosang and Dorian Ferrari step into demanding, ongoing projects and programmes for a limited time, work on the critical points alongside your team and leave again as soon as your team can carry on independently.

A difficult undertaking on your desk? Let's talk.

Sheet 2Instructions · Form PV-7

Project failure in a few simple steps

Ruining a successful project is not that difficult. All you need is:

  1. Enough stakeholders with a veto.And nobody with the right to decide. That would only speed things up unnecessarily.
  2. Responsibilities that are as unclear as possible.If everyone is responsible, nobody can step back.
  3. Decisions nobody wants to make.Carefully prepared, postponed three times, "endorsed in principle" once.
  4. At least 14 priorities.All of them rated "highest".
  5. A contract that both sides have read differently.Both in good conscience.
  6. A status report that has been green for weeks.Reason: "We are still on plan. The one we no longer have."
  7. And, of course, one more steering committee.One meeting per quarter is enough to postpone the decision by a quarter.
Evaluation

7 of 7 criteria met. Your project is very likely ruined. The Institute knows this finding from first-hand observation. Frequently.

  1. Step 1Question: "Do we decide this now?"
  2. Step 2Decision paper, version 7
  3. Step 3Steering committee
  4. Result"Please look into it further." ↺ back to step 2
  5. ExitDecision: currently not foreseen
Fig. 1 – Decision path, schematic. Number of iterations: until the budget runs out.

Sheet 3Transition to reality

End of satire

If you would rather not ruin your project, this is where we come in.

None of the seven points arises from incompetence. They arise in competent organisations, for understandable reasons, each of them reasonable on its own. Only together do they produce an undertaking nobody wanted.

That is exactly where we start. Factually, with experience and without an audience.

Sheet 4What we actually offer

Time-limited senior deployment for undertakings that are anything but simple.

Andreas Hosang and Dorian Ferrari support companies for a limited time on important, demanding projects and programmes.

They do not simply take over project management. Nor do they stay on as advisers on the sideline. They step into the ongoing undertaking and work alongside your team wherever experience makes a difference.

Option A

Advice from the sideline

Analyses, recommends, delivers a report. The undertaking carries on beside it. Implementation stays entirely with you.

Option B

Project management bought in

Takes over the lead. Responsibility moves. When the person leaves, the context leaves with them.

Our deployment

Working inside the ongoing undertaking

We work on the critical topics with you. Responsibility stays with you. The deployment ends with a handover.

Good athletes have coaches. Not because they are bad, but because it is serious.

We assume that we are meeting competent people. Especially with exceptionally demanding undertakings, a second, very experienced view plus additional hands is often the difference between "it runs" and "it runs out of control".

Sheet 5When our deployment makes sense

Typical starting points. And when an engagement fits.

Starting points

  • Difficult decisions that have been on resubmission for weeks
  • Stuck situations with no obvious way out
  • Complex stakeholder constellations
  • Supplier problems, contractual and human
  • Conflicting goals that everyone knows and nobody names
  • Governance questions and unclear responsibilities
  • Demanding transformations
  • Projects with many dependencies
  • An experienced internal team that needs additional seniority at specific points

Criteria for an engagement

  • You yourselves recognise that something must or should change
  • The topic has real priority for you
  • Decisions can actually be taken
  • The ability to reflect is there
  • Responsibility is meant to stay with you
  • The undertaking is demanding enough
  • We can contribute in a meaningful, professional way
  • A successful outcome is realistically possible

We check these criteria together and in both directions. If one does not apply, we say so in the first conversation.

Sheet 6What we concretely do

Working alongside you where it jams.

01

Bring decisions about

The right question, the right people, a reasoned decision. Not the eighth version of the paper.

02

Loosen what is stuck

We work alongside you where an undertaking stalls and get topics moving that everyone knows and nobody wants to touch any more.

03

Lead stakeholders and suppliers along

Present when it gets difficult. Make interests visible, name conflicts, find solutions that hold.

04

Clarify governance and responsibility

Who decides what, by when and with what consequences. In writing, short, and so that people actually act on it afterwards.

05

Order the dependencies

What depends on what, what blocks what, what can wait. So the team can prioritise again instead of juggle.

06

Transfer knowledge and context

After the deployment your team should be able to do and know more than before, not depend more on us.

Sheet 7Catalogue of exclusions

What we expressly do not do.

  • No method training.You know the methods. Usually better than everyday life allows you to apply them.
  • No certification.We do not issue certificates. Not even stamps with file numbers.
  • No standard project management as a commodity.There are good providers for that. We are not their replacement.
  • No free assessment as sales bait.Whoever wants to talk to us talks to us. No questionnaire, no funnel.
  • No artificial long-term advisory model.A deployment that never ends is either a permanent job or a symptom.
  • No taking over your leadership decisions.We prepare, work alongside you and give our assessment. You have to decide.
  • No claim to be specialists in everything.We say early where our contribution brings nothing. That saves both sides time.

Sheet 8How a typical deployment runs

Five steps. The last one is the most important.

  1. Fit conversation

    A short conversation in which both sides check whether our deployment fits your undertaking. Not a sales call. It may end with "does not fit".

  2. Getting in

    We take in the context of the ongoing undertaking: documents, conversations with those involved, the critical points. Without a months-long analysis phase.

  3. Working alongside

    We work on the agreed topics with you. Scope and rhythm are agreed beforehand, responsibility stays with you.

  4. Handover

    Knowledge, decisions and context pass to the team, documented and in such a way that things keep running without us.

  5. Withdrawal

    The end of the deployment is fixed from the start. We do not stay "just to be safe".

Scope, duration and rhythm of deployment are set per undertaking. There is no flat-rate package.

Sheet 9Why we leave again

We did not come to stay as long as possible.

A deployment has succeeded when we are no longer needed. That is why, from the first week, we transfer knowledge and context to your team, and we leave as soon as it can carry on independently.

We come, the knowledge stays.

Sheet 10The case officers

Andreas & Dorian. Practitioners, not method catalogues.

Andreas Hosang

Andreas Hosang

Business Transformation Architect · Hosang Consulting GmbH

Has worked since 2009 in complex change and implementation undertakings of companies and teams. His focus: turning a decision into a way of working that lasts in the organisation.

LinkedIn profile
Dorian Ferrari

Dorian Ferrari

ICT Transformation Lead at MATTLI-DIGITAL · CEO QSH Zurich

Over 30 years of project management and implementation practice, plus 40 years of IT experience. His focus: steering, risks, decisions and reporting in undertakings that take place during ongoing operations.

LinkedIn profile

Fields of experience

  • Enterprise IT
  • Digitalisation
  • Transformation
  • Governance
  • Banking / Finance
  • Digital Health
  • Public administration
  • Logistics and mobility
  • Organisation and processes
  • Vendor management
  • Integration
  • Tenders
  • Complex stakeholder constellations
  • Projects during ongoing operations

Sheet 11Frequently asked questions

Frequently asked questions

The Institute is satire. Our answers are only partly so.

The Institute

Is the Institute for Applied Project Failure meant seriously?

The Institute is satire.

It is not a company of its own and not a product of its own, but the title of this page. The provider is Hosang Consulting GmbH, and the engagements are led by Andreas Hosang and Dorian Ferrari.

We have no intention of ruining your project. Nor have we developed a research programme for systematically maximising cost overruns, additional steering committees and unclear responsibilities.

Although: there would be plenty of material.

Behind the satire is a serious offer: we support clients and executives selectively in demanding projects and programmes, where additional seniority, experience and judgement can make a difference.

Why this humour?

Because we are advertising-damaged ourselves.

We neither want to claim that everything is going badly at your end, nor explain that we will revolutionise your transformation with a proprietary seven-step model.

We like clarity, honesty, reliability and humour. And we believe you can talk about serious project situations without first saying «holistic», «tailor-made» and «sustainable» three times.

The humour is meant to get attention. After that we talk about the project.

What do you actually offer?

Time-limited senior support for demanding ongoing projects and programmes.

We step in where additional experience can have an effect: difficult decisions, unclear dependencies, demanding stakeholder constellations, governance questions, transformations, or situations where an important undertaking is not progressing as it should despite good people.

We work on the real undertaking. Not from the sideline.

Does this fit us?

Does our project have to be in trouble already?

No. Preferably not, actually.

A project can be well led and still become so demanding that additional experience makes sense. After all, top athletes do not have coaches because they cannot play their sport.

We generally assume that our clients have competent people and functioning structures.

Who is the offer for?

For clients, sponsors and executives who carry responsibility for an important undertaking.

The right moment typically arises when you think: «We are actually doing a lot right. But this project currently demands more.»

The undertaking must be relevant enough for additional seniority to be justified economically and professionally.

What do we have to bring as a client?

You do not have to share our opinion. But you must be prepared:

  • to look honestly,
  • to bear uncomfortable observations,
  • to take decisions,
  • to take responsibility,
  • and, where needed, to question yourselves.

We do not come to take over leadership responsibility that must stay with the client. If the willingness to look and to decide is missing, the engagement does not fit.

Who is the offer not for?
  • Not for companies that simply want to buy additional project manager capacity.
  • Not for clients who want to delegate difficult decisions entirely to outsiders.
  • Not for tasks that can be done just as well internally.
  • And not for projects that are to be awarded only because budget happens to be available.

We select engagements deliberately. A project that is too simple or standardised may therefore also get a no from us.

Do you replace our project management?

No.

The aim is not to swap out good project managers. We complement the existing team where additional seniority, perspective or experience helps.

Responsibility stays where it belongs. With the client.

How we work

What do you concretely do?

That depends on the undertaking. Typical topics are, for example:

  • clarity on goal and mandate,
  • difficult decisions,
  • governance and decision paths,
  • stakeholder and supplier constellations,
  • dependencies between sub-projects,
  • prioritisation,
  • steerability and transparency,
  • handover and anchoring,
  • or the question of why an essentially good undertaking has become unnecessarily hard.

We do not necessarily look for ten problems. Our experience is rather: often only a few adjusting screws are needed. But the right ones.

What matters to you in collaboration?

Transparency. Honesty. Humour. Reliability. Clear agreements. And the willingness to call things by their name without belittling people.

For us, radical honesty does not mean maximum change. Sometimes a deliberate «we leave it exactly as it is» is the right decision, once the consequences are understood.

Who leads the engagements?

The engagements are led by Andreas Hosang and Dorian Ferrari.

They remain the engagement leads, even when additional expertise is brought in.

What role does the Leverage Experts network play?

A limited one.

If additional specialist expertise is needed for a concrete question, suitable international expertise from the Leverage Experts network can be brought in. That does not mean every specialist field of our network suddenly becomes part of our own offer.

We do what we can. And we also know when someone else can do something better.

Which industries do you work for?

We do not define ourselves through the longest possible list of industries.

Domain knowledge matters for demanding project work. That is why we do not take on engagements that are professionally arbitrary. What matters is whether our experience fits the situation. Where additional specialist knowledge is needed, suitable experts can be brought in.

Is it only about IT projects?

No.

What is relevant are demanding projects and programmes, regardless of whether it is, for example, transformation, digitalisation, organisation, integration, governance, operations or a complex customer project.

The label of the project matters less than the question: is the undertaking demanding enough for additional experience to really make a difference?

Do you sell project management methods?

No.

We sell neither HERMES, Scrum, PRINCE2, PMI nor any other method training as this offer. Method knowledge belongs in the toolbox. It is not the product.

Is there a free project check first?

No.

We do not work with free assessments or artificially cheap entry offers in order to sell consulting afterwards. If a situation has to be clarified first, that clarification is already real work and therefore a paid service.

Incidentally, a good outcome can also be: you do not need us afterwards at all.

Engagement, price & organisation

What does an engagement cost?

Our day rate is CHF 1,650 excl. VAT.

How many days an engagement comprises depends on the task, responsibility, seniority required and scope. We clarify that beforehand. We do not work with teaser prices or discounts as a sales mechanism. Every service should have its own economic value from the start.

How long does an engagement last?

As long as necessary. And no longer.

Our aim is not to become a permanent part of your organisation. Knowledge transfer and exit are part of the engagement from the start. The aim is that your team can carry on more independently after our work than before.

Or shorter: we came to leave.

When can you start?

We clarify that in the first conversation.

We deliberately take on only a limited number of demanding engagements at the same time. That is why in the first conversation we clarify both the professional fit and the possible start date.

In which geographical area do you take engagements?

Main focus Switzerland. Engagements outside Switzerland depending on the situation and engagement.

Do you work on site or remotely?

That depends on the undertaking.

What matters is not where we open a laptop, but where we can have a meaningful effect. In some situations remote work is enough. In others you have to sit at the table with the people. We clarify that together.

What stays with us after your deployment?

Ideally more than before.

Decision logic, relevant knowledge, approach, documentation and insights gained should stay with the client. We do not want to create artificial dependency.

Our engagement is successful when you need us less afterwards than before.

We come, the knowledge stays.

Any other questions?

Why do you get involved in such projects?

Because difficult projects are interesting.

We like situations in which experience really makes a difference. And we find it more satisfying to work on the decisive adjusting screws in a short time than to produce consulting slides about a problem for months.

Our aim is: the greatest possible effect in the shortest possible time. Not the longest possible presence.

I am not sure whether our undertaking fits. May I simply ask?

Yes.

Below are two ways forward: book a date directly, or ask a question first.

One last question: can you really ruin our project?

We do our best.

For the actual deployment, however, we recommend the other direction.

Sheet 12Application for a conversation

A difficult undertaking on your desk? Let's talk.

A short conversation in which both sides check whether our deployment fits your undertaking. No analysis, no free package, no funnel. If it does not fit, we will say so.

One sentence about your undertaking is enough. We will clarify the rest in the conversation.

"Institute for Applied Project Failure" is the title of this page, not a company and not a legal entity. The provider is Hosang Consulting GmbH. The service behind it is real.